DATE: MARCH 13,
2019,WED.
PRIMARY ON
TODAY:
- ONCE UPON A TIME, ONCE UPON TWO TIMES, ONCE UPON THREE TIMES, ETC.
- I GOT MY PHYSICAL BODY PROBLEMS ON MY BACK AND IN MY RIGHT FOOT, WHILE AT MY AGE AT 12,13, 14 YEARS OLD, WHILE AFTER I CARRIED NATURE DRINK WATER VIA TOW TONKS WITH BULK ON MY RIGHT SHOULDER, DUE MY AGE SO YOUNG, THE HEAVY LOAD OF NATURE WATER HURT MY “BORNE” AND NERVES CONNECTED, ETC.
- TODAY, AFTER I TREATED THE MY PHYSICAL BODY PROBLEMS WITH THE SERVICES OF MEDICAKL DOCTORS, WESTERN AND CHINESE TRADITIONAL MEDICAL HOSPITALS SINCE NOVEMBER 27, 2018, UP TO TODAY, AND SHOULD CONTINUED UP TO TWO MORE MONTHS, AND SEE HOW THE FINAL CONDITIONS WITH MY NERVE PAIN OCCURRED IN/DURING THE LAST THREE MONTHS.
- TODAY, I GOT BETTER CONFIDENCE DUE I TRUSTED THE MEDICAL DOCTORS ARE SO GOOD AND SO “ PROFESSIONAL”, WHILE I MET AND CARED BY THEM, HE, SHE, AND THEY.
- HIGHLY APPRECIATED.
WHAT ABOUT THE
FOLLOWING: JUST PARTIAL MY WORKING TERRITORIES , MY FIELDS, ETC., IN THE LAST,
DURING ABOUT 40 YEARS LONG TIME.
OK.
SPR/Special
Project Related
HVAC (5 to 10% Of Total)
SCOPE OF WORK
GUIDE FOR SCHEMATIC DESIGN PHASE
1.
Prepare Outline Description
including:
2.
Space requirements
3.
Sketches where required.
4.
Construction cost estimates in
dollars per sq.ft.
5.
Recommendations for studies and
reports to be included in subsequent phases of work
SPR/Special
Project Related
HVAC (20-25% Total)
SCOPE OF WORK
GUIDE FOR SCHEMATIC DESIGN PHASE
A. General
B. Scope of Work
1. Update and confirm SDD Phase of work.
2. Prepare Load estimates
a.
Using H-Load Program
b.
Use of hand Cal.
3. Design criteria
4. Energy analysis
5. Drawings
a.
Abb. & sys. List
b.
Typical Fl. Plan
c.
Establishing space requirements
and accessibility
d.
Establish weights of major
equipment and average loads
e.
Typical AC system flow diagram
f.
Applicable flow and riser
diagrams (air & Water).
6. DD (Preliminary) Specification.
7. Cost estimate
File: PPC. Memo. #04042014,ok99
CC: PM of Each Trade
Taichung Tower II
Date: Oct. 3, !999 Memo.# 26 PPC/ADSC
Subject: ELECTRICAL/ SCOPE OF WORK GUIDE
FOR SCHEMATIC DESIGN
Taichung Tower II
Date :
Sep.30,99 Memo.#21 PPC/ADSC
Re :
HVAC/ M&E Design Input Data
Subject – HEAT
LOSSES FOR TYPICAL ELECTRICAL EQUIPMENT
1.
TRANSFORMERS
A.
General – Approximate loss of
15KW per 1000 KVA.
B.
Dry Type, 600 volts and under :
30 thru 500 kva over
600 volts : 750
thru 1000 kva.
Approximate %
Total loss
80Degree Temp Rise; 115 Degree Temp Rise;
150Degree Temp Rise; KVA Range
2.58% 2.98% 4.20% 30 thru 75
2.10% 2.30% 3.50% 112.5 thru 225
1.45% 1.64% 2.30% 300 thru 500
1.13% 1.32% 1.55% 750 thru 1000
l Square D Company
C.
Oil Filled
Approximate % Total Loss
5/8.33 KV; 25KV class ; 35 KV class ; KVA Range
5800 watts 6300 watts 6880 watts 500KVA
7500 8750 9400 750
9900 10500 11500 1000
14600
15400 16300 1500
18500 19400 19900 2000
22500 23900 24700 2500
* Westinghouse, Catalog 47-121 page 4,
PLAZATRON NETWORK
2.
UNIT SUBSTATIONS
A.
Transformers – Approximate loss
of 15 kw per 1000 KVA
B.
Breakers (460v)- Approximate
loss of 400w per breaker
C.
Breakers (4160v) – Approximate
loss of 800w per breaker
l Electrical Construction and Maintenance
3.
MOTOR CONTROL CENTER
A.
General – Approximate loss of
200w per vertical section
B.
Components
MOTOR CONTROL
CENTER COMPONENTS
Component ; Size/Rating Approximate Loss BTU per Minute
Magnetic Size 1 0.9
Starters Size 2 2.5
3
4.5
4
8.0
5
17.0
Circuit Breakers 100
Amps 0.5
225 thru 600 amps 9.0
Fusible Switches 30 Amps 0.5
60 Amps 1.0
100 Amps 2.5
200 thru 600 Amps 9.0
Control Transformers 50VA 0.5
100VA 0.9
150 VA 1.3
300VA 2.6
500VA 2.9
750VA 4.3
1000VA 5.7
* Square D Company
POSTING ON MARCH 13, 2019, WED.
No comments:
Post a Comment