Wednesday, March 13, 2019

ONCE UPON A TIME AT MY AGE 12 YEARS OLD, ONCE UPON SECON TIMES AT MY AGE AT 13 YEARS OLD,


DATE: MARCH 13, 2019,WED.
PRIMARY ON TODAY:

  1. ONCE UPON A TIME, ONCE UPON TWO TIMES, ONCE UPON THREE TIMES, ETC.
  2. I GOT MY PHYSICAL BODY PROBLEMS ON MY BACK AND IN MY RIGHT FOOT, WHILE AT MY AGE AT 12,13, 14 YEARS OLD, WHILE AFTER I CARRIED NATURE DRINK WATER VIA TOW TONKS WITH BULK ON MY RIGHT SHOULDER, DUE MY AGE SO YOUNG, THE HEAVY LOAD OF NATURE WATER HURT MY “BORNE” AND NERVES CONNECTED, ETC.
  3. TODAY, AFTER I TREATED THE MY PHYSICAL BODY PROBLEMS WITH THE SERVICES OF MEDICAKL DOCTORS, WESTERN AND CHINESE TRADITIONAL MEDICAL HOSPITALS SINCE NOVEMBER 27, 2018, UP TO TODAY, AND SHOULD CONTINUED UP TO TWO MORE MONTHS, AND SEE HOW THE FINAL CONDITIONS WITH MY NERVE PAIN OCCURRED IN/DURING  THE LAST THREE MONTHS.
  4. TODAY, I GOT BETTER CONFIDENCE DUE I TRUSTED THE MEDICAL DOCTORS ARE SO GOOD AND SO “ PROFESSIONAL”, WHILE I MET AND CARED BY THEM, HE, SHE, AND THEY.
  5. HIGHLY APPRECIATED.

WHAT ABOUT THE FOLLOWING: JUST PARTIAL MY WORKING TERRITORIES , MY FIELDS, ETC., IN THE LAST, DURING ABOUT 40 YEARS LONG TIME.
OK.

SPR/Special Project Related

HVAC (5 to 10% Of Total)

SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN PHASE

1.            Prepare Outline Description including:

2.            Space requirements

3.            Sketches where required.

4.            Construction cost estimates in dollars per sq.ft.

5.            Recommendations for studies and reports to be included in subsequent phases of work



SPR/Special Project Related

HVAC (20-25% Total)

SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN PHASE

A.  General

B.  Scope of Work

1.  Update and confirm SDD Phase of work.

2.  Prepare Load estimates

a.            Using H-Load Program

b.            Use of hand Cal.

3.  Design criteria

4.  Energy analysis

5.  Drawings

a.            Abb. & sys. List

b.            Typical Fl. Plan

c.            Establishing space requirements and accessibility

d.           Establish weights of major equipment and average loads

e.            Typical AC system flow diagram

f.             Applicable flow and riser diagrams (air & Water).

6.  DD (Preliminary) Specification.

7.  Cost estimate

File: PPC. Memo. #04042014,ok99

CC: PM of Each Trade













Taichung Tower II


Date: Oct. 3, !999                 Memo.# 26            PPC/ADSC

Subject: ELECTRICAL/ SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN



Taichung Tower II


Date : Sep.30,99       Memo.#21            PPC/ADSC



Re :  HVAC/ M&E Design Input Data

Subject – HEAT LOSSES FOR TYPICAL ELECTRICAL EQUIPMENT

1.            TRANSFORMERS

A.                General – Approximate loss of 15KW per 1000 KVA.

B.                Dry Type, 600 volts and under : 30 thru 500 kva over

600 volts : 750 thru 1000 kva.

Approximate % Total loss

80Degree Temp Rise; 115 Degree Temp Rise; 150Degree Temp Rise; KVA Range

  2.58%              2.98%               4.20%          30 thru 75

  2.10%              2.30%               3.50%        112.5 thru 225

  1.45%              1.64%               2.30%        300 thru 500

  1.13%              1.32%               1.55%        750 thru 1000

l  Square D Company



C.                Oil Filled

Approximate % Total Loss

5/8.33 KV;       25KV class ;        35 KV class ;           KVA Range

5800 watts       6300 watts         6880 watts              500KVA

7500            8750              9400                   750

9900           10500             11500                  1000

14600          15400             16300                  1500

18500          19400             19900                  2000

22500          23900             24700                  2500



* Westinghouse, Catalog 47-121 page 4, PLAZATRON NETWORK



2.            UNIT SUBSTATIONS

A.            Transformers – Approximate loss of 15 kw per 1000 KVA

B.            Breakers (460v)- Approximate loss of 400w per breaker

C.            Breakers (4160v) – Approximate loss of 800w per breaker

l  Electrical Construction and Maintenance



3.  MOTOR CONTROL CENTER

A.            General – Approximate loss of 200w per vertical section

B.            Components

MOTOR CONTROL CENTER COMPONENTS

Component ;     Size/Rating        Approximate Loss BTU per Minute

Magnetic         Size 1                 0.9

Starters          Size 2                 2.5

3                                                                        4.5

4                                                                        8.0

5                                                                        17.0

Circuit Breakers     100 Amps              0.5

                225 thru 600 amps          9.0



Fusible Switches     30 Amps               0.5

                   60 Amps               1.0

                  100 Amps               2.5

               200 thru 600 Amps           9.0

Control Transformers    50VA                0.5

                     100VA                0.9

                      150 VA               1.3

                       300VA               2.6

                       500VA               2.9

                       750VA                4.3

                       1000VA               5.7

* Square D Company

POSTING ON MARCH 13, 2019, WED.

No comments:

Post a Comment