August
28, 2014
Philip
Pai-Pin Chen
Peace &
good days Local & Worldwide.
Keys for the days.
Key one of two.
I.
Samuel Butler, 19th
century, said:
Life is like playing a violin solo in
public and learning the instrument as one goes on.
Key two
of two.
II.
Plutarch, ca.A.D. 100, said:
CHARACTER
IS SIMPLY HABIT LONG ENOUGH CONTINUED.
Thank
you so much.
NYSEASIA
worldwide
Nyseasia
USA Asia Worldwide
Combat
Climate Change Worldwide
Green
Energy & Power Promotion Task Force Worldwide
NYCRITICAL.com;
NYESSENTIAL.com
Mission
Critical & Essential, Broad, NY, USA, Asia & Worldwide.
Usahsr.com;
usaamericanservice.com
August 28, 2014
Philip Pai-Pin Chen
Good days and peace worldwide.
Draft:
Revised and updated required.
Not for Construction.
Please contact head office located in Manhattan,
New York City, USA prior ahead should you interest your projects in NYC or USA
local & Nationwide. Or contact me via nyseasia@gmail.com
for your concern. Thanks.-Philip Pai-Pin Chen-08/28/14
What about for todays and coming years.
Draft: materials shown below not for any purposes.
Thanks.
“Brach checking OF BUILDING DESIGN PROJECT REVIEW”
NYSEASIA
Branch checking OF BUILDING DESIGN
PROJECT REVIEW
Project: Ph. 8569B HVAC Plant Project MGR. P. Smith
At NY
Tech. Center To
Pro. MGR. 8/28/14
To Consultant: /nyseasiaworld /
Consultant: nyseasia.com- Engineers Prepared By: Marlowe
Phone NO. X-8759
Discipline: Elect.
Phase: Preliminary
Notes: 1...
Review shall include comments pertinent
to
drawings. specifications & estimates
2. A written response is required
to all the
following comments within two weeks
ITEM
COMMENTS
1. General:
a. No written response received
on prelim. Comments dated 7-27-14 as
of to date. Item #2 through #6 not complying.
2. Title block:
a. Indicate the drawing title, also
contract number & sheet no.
b. Provide scale & date
3. Provide or show removal works in the drawing.
4. Mechanical Room:
a. Two motors shown unidentified.
b. Identify the 2-Electric. Panel
shown.
c.
Identify the floor plan shown and scale.
d. How do you intend to install
the” 31/2”C “shown.
e. Is the combination starter
shown integrated w/ the equipment.
Page 2
DDP/D&C/DPOP Branching of OF BUILDING DESIGN
PROJECT REVIEW
5. One line Diagram - Exist. MCC:
a. Identify the circuit. no.
& the fuse & starters ratings.
b. Indicate the size of wires to
be run in the existing conduits.
6. Is there any lighting layout.
See comment item #3 of Prelim. Submission
dated 7-12-14.
7. Incomplete electrical data on
mechanical schedule.
8. Provide symbol list required.
9. Indicate “How do you intend
to tap the exist. SWBD. “A1” to the new
sub-breaker CB-8.
10. Show concrete encased details
- prefer bus duct.
11. Estimate:
a. Branch feeders 100 A, 200 A,
300 A- not shown in drawings.
b. provide a detailed breakdown
of estimates on chiller feeders.
c. Motor starter shall be by
others.
PROJECT REVIEW
PREPARED BY: A.P.
Item Comments
1. Check and coordinate with “Con-Ed. “requirements
regarding the new
Electric
service requirements.
2. Show location of panel LP1-MCC2-ME1 & MR3
, and identify, if existing.
Page 3
3. Provide a mounting details of the lighting
fixtures shown & indicate
manufacturer & circuit no.
4. Check space location of the new switchboard
“C1”.
5. MCC - One Line Diagram:
a. Identify circuit no.
b. Indicate new fuses ratings,
& its starters.
c. Indicate the feeder sizes
within existing conduits.
d. Existing conduits to P-1,P-2,P-3,P-4,P-5,P-6.
Check if existing
conduits are reusable.
6. Show smoke detectors if required.
7. Provide a detailed breakdown of estimates.
More will be added ASAP-Philip Pai-Pin Chen.
2014年8月28日
Philip Pai-Pin Chen, NYSEASIA Worldwide
陳柏彬
Mission Critical & Essential, Broad, NY, USA,
Asia & Worldwide.
Mechanical and Electrical consulting Engineers
機電顧問工程業務
重要工作範圍建議事項
(Suggested Scope of Work ):
1. 計劃, 設計和監督 (Planning, Design and Inspection)
2. 專案管理 (Project Management)
3. 溝通與協調 (Communications and Coordination)
4. 操作運轉與維修 (Operation and Maintenance)
5. 其他,(配合業主要求)
|
|
|
技術服務
|
|
服務/工程/管理/電腦輔助設計
|
|
Services/Engineering/Management:
|
空調工程(HVAC
Engineering):
調溫暖房;通風;空調;製程管路;工業排氣;儀表控制;能源再生;熱能再生;無塵室.
2.電機工程(Electrical Engineering):
建築物電力;緊急發電廠;不斷電系統;特殊接地系統;電磁干擾防護;照明;照明控制;配線管理.
3.配管工程(Sanitary Engineering):
(雨水與污水)下水道排水系統;自來水系統;瓦斯系統;醫院瓦斯系統;處理過之水供應系統;壓縮空氣及真空系統;噴泉及游泳池.
4. 區域動力共用工程(Site-Utilities Engineering):
電力配電系統;供水,處理及分配;蒸汽,冷卻水及熱水供應分配;區域排水系統;廢水處理,重用,或廢棄.
5.建築物電子系統工程:
(Building Electronic Systems Engineering)
自動監視與控制系統;防火管理;保全管理;通訊網路整合;影音系統.
6.通訊工程(Communications Engineering):
電信通訊;局部區域網路;辦公室自動化整合;光纖應用;聲音/資料傳輸管理.
7.控制系統(Control System Engineering):
分散式直接數位控制;能源管理;製程控制;功能最佳化;建築物內網路整合.
8.救生與消防
(Life & Fire Safety Engineering)
符合法規;偵測與警報系統;滅火系統;瓦斯鎮壓系統;煙火意外撤離與控制;緊急通訊.
9.中央共用動力系統工程:
(Central Utilities Engineering)
高溫熱水與蒸汽;發電廠(燃煤,油,瓦斯);冷凍廠;汽電共生廠;區域性暖房/冷卻系統;空氣污染防治;管線分配;焚化爐.
10.建築物輸送系統:
(Building Transport Systems Engineering)
交通量分析;電梯,電扶梯,小型送貨電梯;走動式電動扶梯/舷梯;氣動傳輸管,自走式運輸車,旋轉式輸送帶,旅客/貨物輸送帶;空氣傳動與手動式收集系統;固體廢棄物處理;髒污衣物清洗系統.
11.設備與裝置管理(Facilities Management):
電腦化維修程式;系統操作與維修手冊;預防性維修與工作程序計劃;維修人員安排;指導與員工訓練;建築設備管理講習會;設備與建築物條件分析.
12. 能源管理(Energy Management):
建築物能源保存分析.
13. 電腦輔助設計(Computer-Aided Design):
電腦電腦化能源分析;規範電腦化作業;化應用顧問;電腦化製圖與設計.
14.營建監造
(Construction Inspection & Supervisory)
15.More
will be added as per request.