DATE: March
28, 2018, WED.
PAI-PIN CHEN,
P.E.
PHILIP PAI-PIN
CHEN, P.E.
PAIPIN CHEN.
PAI PIN CHEN,
INTERNET.
NYSEASIA,
NYPEASIA, NYCEASIA, LOCAL, NATIONAL, WORLDWIDE.
WORKING AND
PROCESSINF ONE OF XXX (10, MAXISIM?).
AS PER THE
MAYER OF TAIPEI CITY, TAIWAN, REPUBLIC OF CHINA, POSTING IN MY FACEBOOK,
REGARDING THE COMING BILL OPENING FOR THE TWO TOWERS, NAMED TWIN TOWERS IN
TAIPEI CITY, NEARBY THE TAIPEI MAIN RAILWAYS STATION.
I STRONGLY
SUGGESTED, SUGGESTING THESE TWO TOWERS SHALL BE FOLLOWING THE USA STANDARD, IN
NYC, NY, USA, LOCAL, NATIONAL AND WORLDWIDE.
PLEASE NOTE: THE FOLLOWING WORDS, SHALL BE THE MAIN
KEY MATERIALS WITH THE PROJECT AFTER THE GROUP, TEAM AND KEY PEOPLE, INCLUDING
THE VIP, PRESIDENT AGREED AND APPROVED THE CONTRUCTION WILL BE GOOD FOR PEOPLE
IN TAIPEI, TAIWAN ISLANDWIDE.
DRAFT, REVISED
AND UPDATED REQUIRED.
P1 OF 7, DATE:
May 21, 2017, SUNDAY.
I.KEY FOR MY
DAYS IN THE PAST SINCE YEAR 1971, I APPLIED “DOS” CREATED BY MICROSOFT, AND
CONTINUED IN YEAR 1980,1981,1982, WITH “NEW” SOFEWARE, WINTH “WINDOWS AND
ASSOCIATED”, UP TO THE PAST MANY YEARS ,SUCH AS YEAR 1988,1989,1990, 1991, ……,
2006,20017..,
2011, 2012,………….,
2016 WIN.10, AND 2017 WIN.10, AND THE YEARS FROM 2017-2030.
II. I AM VERY
GOOD , NO MATTER HOW GOOD YOU ARE.
III. THANK YOU
VERY MUCH, AS I PRACTICE MY PERFORMANCES SINCE YEAR 1971.
IV. HIGHLY
APPRECIATED.
V. PLEASE
NOTE:
1.THE
FOLLOWING MATERIALS SHOWN, NOT FOR CONSTRUCTION.
2. THE
MATERIALS SHOWN REVISED AND UPDATED REQUIRED-PAIPIN CHEN, DATED ON MAY 21ST.,
SUNDAY,2017
IEEE.MOBI
LEEE.MOBI
SYSKAHENNESSY.MOBI
JAROSBAUMBOLLES.COM
JAROSBAUMBOLLES.MOBI
PAIPINCHEN.COM
SYOUFENCHEN.COM
PAI PIN &
SYOU FEN CHEN
THE SEVENTH
ISUED.
Thank you so
much.
Good days and
nice time worldwide.
nyseasia.tv
Philip Pai-Pin Chen.
March 4th.
2015
Philip Pai-Pin
Chen
I am preparing
for back on line ASAP.
P1 OF 7.
P2 OF 7.
Happy
birthday. I. ArchitectureEngineering.us II. ArchitectureEngineering.us
Registered on March 3, 2015. PAGE ONE OF SIX.
Highly
appreciated.
1. The one of
the many items following, I will, may, might be involved in the year 2016, Mid
Term, 2016, 2017 and coming years.
2. In 2015, I
won’t work on the fields as I preferred due the location, space I stay,
staying, and stayed still not passing the “law” let me can applied my LICENSE
NUMBER 60513,PAI-PIN CHEN, SINCE 1988 in Taiwan.
3. Today,
March 4, 2015, I need to work on step by step and back to Manhattan, New York
City, USA and see what I can do if I like to do something I enjoy doing it.
4. More to be
posted.
DRAFT: Revised
and updated required.
ATTN:
PLEASE CONTACT
ME, PHILIP PAI-PIN CHEN, SHOULD YOU INTEREST IN THE PROJECTS EXISTING, EXISTED,
OR NEW COMING IN YOUR TERRITORITIES. YOU CAN REACH ME: VIA: nyseasia@gmail.com.
Thank you very
much. Phil.
What about:
concern you, concern me and us; good with you all, al time.
CONTRACT
CHECKLIST (Not for Construction).
The numbering
systems need to be revised for easy reading and for official purposes.
"sorry, i
will fix and re-numering in he later time or dats for you and myself"
OK!, bear with
me at this moment-PAI-PIN CHEN.03042015.
This checklist
was reviewed on March 4, 2015 , at NYSEASIA.TV , between Mr. /Ms. “PPCPE” Of
“NYSASIA” and Mr. /Ms. n/a Of N/A , and will be used as the basis of the
Agreement between both parties.
When agreed to
by both parties, this contract list can be attached as a rider to the
Agreement; and therefore, be a part of the Agreement.
1. Project
Description
1.1 Type of
Project 1.2 New and/or Existing Building(s) 1.3 Type of Construction (i.e.,
steel and concrete, concrete, etc.) 1.4 Number of Buildings 1.5 Base Building
Core and Shell and/or Tenant Work 1.6 Gross Square Feet Areas of Building(s)
and Site (Acres) 1.7 Location (address if available) City, State, Country 1.8
Estimated cost if established 1.9 Method of preparing documents and bidding
(i.e., Fast track, multiple prime contract, etc.) Work Additional Comments
2. Scope of
Services Included Engineering Services
a. Schematic
Design Phase*-P2 OF 7.
P3 OF 7.
(1)
Studies-Engineer will study The following alternative Systems including
advantages, Disadvantages, budget cost And recommendations. -HVAC (INCLUDING
CENTRAL PLANTS) (LIST) -ELECTRICAL (List) -SANTARY
P3 OF 6,(List)
-VERTICAL TRANSPORTATION (List) -FIRE AND LIFE SAFETY (List) -SECURITY (List)
-COMMUNICATIONS (i.e., data, etc.) (List) -Other Notes: (a) Recommendations for
further studies In subsequent studies in subsequent Phases of project. (2)
Survey of existing facilities and conditions and report of findings. (3)
Verification of accuracy of drawings or other information furnished by owner.
(4) Design Criteria including applicable codes and standards, and systems
descriptions. (5) Space conditions and weights for M/E and other applicable
trades equipment. (6) Outline Specifications. (7) System Flow and/or Riser
Diagrams, block layouts of M/E and major spaces. (8) Part or full typical floor
layout for: -HVAC -ELECTRICAL -SANITARY -FIRE PROTECTION (9) Major equipment
sizing. (10) Discussions and confirmation With applicable public agencies And
utility companies concerning Project and services. Note: This should be
specifically Discussed with client since on some Projects (especially in the
Schematic Design Phase) we are directed not To contact anyone regarding the
Project. (11) Preparations of estimated Construction costs on a square foot
Basis. (Note: This may be provided by Engineer, Construction Manager, General
Contractor Or Cost Consultant. )
b. Design
Development Phase
(Based on
Approved Schematic Design Phase) * (1) Additional Studies for: -HVAC (List) -Electrical
(List) -Sanitary (List) -Vertical Transportation (List) -Automation (List)
-Fire and Life Safety (List) -Security (List) -Communications (List) -Other
(List) (2) Outline Specifications (if not furnished During Schematic Phase) or
first pass Using final specifications. If final Specifications are to be used,
verify format. (3) Updated drawings confirming space Conditions, weights,
equipment and system Sizing and selection. (4) Updated Design Criteria. (5)
Updated utility information. (6) Updated estimated construction costs. (Note:
This may be provided by Engineer, Construction Manager, General Contractor Or
Cost Estimator.)
c.
CONSTRUCTION DOCUMENT PHASE (Based on approved design development Phase)
* (1)
Additional Studies for: - HVAC (List) - Electrical (List) - Sanitary (List) -
Vertical Transportation (List) - Automation (list) - Fire and Life Safety
(List) - Security (list) - Communications (List) -Other (List) (2) Final
Specifications and
P3 OF 7.
P4 OF 7.
verify format.
(Unless already established in Design Development Phase) (3) Final Drawings -
verify size of drawings. (4) Verify if separate Drawings and/or –Specifications
are required for: Tenant Areas Special System (i.e., Security, etc.) (5)
Filing of documents with authorities having Jurisdiction. Verify scope (i.e.,
preparing Submissions or actually filing). d. Bidding and Construction Phase*
(1) Review and recommend list of bidders. (2) Pre and Post bid meetings with
Contractors. (3) Analyses of Bid and contractors proposed Substitutions prior
to
award of
Contract (Where allowed by Specifications). Note: If substitutions affect
design, System performance and intent, this Should be considered as additional
Engineering Services. This would Include time for the analyses and Implementation,
if the substitution(s) Are accepted by client. (4) Review of Shop Drawings and
Samples. Note: Engineer will include in Final Specification items required to
be submitted For review. If other items are submitted and Require review, they
will be considered as Additional Engineering Services. (5) Review of Contractor
prepared coordination Drawings. (6) Preparation of Change Orders, Other than
Owner initiated. (7) Review of Contractors application for Payments for
Contract Work and for Authorized Change Orders. (8) Preparation of As-Built
Drawings, Or Review of Contractor prepared As-Built Drawings. (9) Field
Observation (a) Periodic - fixed number. (b) On Call. (c) Full Time and
determines Number of personnel. (10) Attendance at Field Meetings and Establish
frequency. (11) Punch Lists and Final Acceptance. (12) Witnessing Factory
Tests. *Note: Some Government Agencies Require very specific work to be
performed Under the various phases of Services (i.e., submissions based on a %
of completion). Where applicable, they must govern.
3. Special
Services The following Services are not included as Part of Basic Services; and
therefore, not Included in Basic Fee.
a. programming
and special analyses (i. e., space relationship scheduling, etc.). b. Assisting
in the preparation of application for Government grants or financing for
project. c. Environmental Impact Studies and analyses And assistance in
obtaining approval from Authorities having jurisdiction. d. Services related to
future facilities. e. Preparing separate Construction Documents For Alternates.
Where fee basis is % of Construction Costs, this would be only applicable for
work not Constructed. Where project is Lump Sum or Time Card to Upset, all
alternates whether constructed or Not is a Special service. f. Prepare Change
Orders to reflect changes initiated By Owner. Where fee basis is % of
Construction Costs, this would be applicable for work not contructed. If work
is constructed, the preparation of the Change Order is still a
P4 OF 7.
P5 OF 7.
Special Service
and The fee should be adjusted based on % of Construction cost to
cover other
aspects of work (i. e., Coordination, Shop Drawings, field Observations, etc.).
Where project is Lump Sum, or Time Card to Upset, preparation of Change Orders
whether Constructed or not is a special Service. g. Services in connection with
evaluating Substitutions proposed by Contractors after Award of contract. h.
Making revisions to Drawings and/or Specifications related to the
substitutions. i. Providing coordination of work performed By separate
contractors. j. providing quantity surveys and detailed Construction Cost
Estimates. k. Providing services in connection with the Work of a construction
manager or other Consultants retained by Owner. l. Providing services related
to the start-up of M/E Systems. m. Preparing to serve or serving as an
expert witness
In connection with any public hearing, arbitration Or legal proceeding. n.
Preparing Operations and maintenance Manuals. o. Analyzing maintenance and
operating costs for Project or portion of project. p. Providing training of
personnel for operations And Maintenance. q. Providing consultation services
after completion Of Construction phase and final acceptance (Including
follow-up field observation, preparing Follow-up punch lists, etc.). r.
Preparing energy analysis subsequent to occupancy. s. Designing of Mock-ups,
Samples and Demonstration Models including their construction and demolition
Costs. t.
Services of
Special Consultants For:
(1) Acoustics (2) water Treatment (3) Cost Estimating
(4) Laboratory Tests (5) Electrical Tests (Electromagnetic Interference, etc.)
(6) Structural (7) Architectural (8) Other u. All reimbursable costs, including
travel time For the above (Or any other additional Special Services). 4. Field
Services The services described in Paragraphs 2 and 3 will Cover the following
fields: Note: Where Special systems are to be included, They should be reviewed
with the Engineering Policy Committee. a. Mechanical Engineering (1) Air
conditioning (2) Heating (3) Ventilating (4) Boiler plant (5) Refrigeration
Plant (6) Site Distribution piping for: (7) Special Systems Note: The inclusion
of the following Will either increase the basic fee or Treated as special
Services. -Solar Energy -Energy Storage (ice, Chilled Water, hot water, etc.)
-Heat Recovery -Process Piping -Automation and Control (can be provided under
Automated monitoring and Control Services) -Design for Atriums, Malls or other
special areas. Note: Requirements for special smoke control systems. -Humidity
Control -Clean Room Laminar Flow Systems (Class to be determined) -Other b.
Electrical Engineering (1) Incoming Service (2) Interior Distribution (3)
Telephone
P5 OF 7.
P6 OF 7.
(2) Conduit System (4) Building Standard Lighting (5)
Building Standard Lighting Control (6) Motor Control (7) Clock System (8) Fire
Alarm Systems* (9) Master Antenna Systems* (10) Grounding System- 25 ohms to
Ground (11) Normal Utility Metering (12) Emergency power System (13) Underfloor
Raceway System Design (14) Pipe Beat Tracing (15) Snow Melting (16) Nurses Call
System (17) Patient Headwall Systems (18) Equipotential Grounding Systems (19)
Special Systems Note: The inclusion of the following Will either increase the
Basic Fee or be Treated as Special Services. -Site Electrical Distribution
-Site Telephone Distribution -Special Area Lighting (Define) -
Special Area
Lighting Control (i. e., Dimming, Etc.) ( Define) -Data Communications Systems*
-Telephone Systems* -Security Systems* -Special Signal & Alarm Systems*
-Halon Systems (Wiring) -Satellite Earth Station Provisions -CCTV Systems*
-Sound & Paging Systems* -Door Alarm Systems* -Grounding Systems of Less
than 24 ohms to Ground -Vehicular Access Control -Intercom Systems* -UPS.
Systems -Modular Wiring Systems -Electrical
Submetering Systems -EMI Shielding -Computer Rooms -Kitchens -Audio/Visual Work
(Wiring) -Other * CAN BE PROVIDED UNDER AUTOMATED MONITORING AND CONTROL
SERVICES. c. Sanitary Engineering (1) Sanitary drainage and Vent (2) Storm
Water Drainage (3) Domestic Hot & Cold water (4) Fire Standpipe (5)
Hospital or Laboratory Medical Gas Systems (Oxygen, Nitrous Oxide, Compressed
Air) (6) Hospital or Laboratory Vacuum Air (7) Hospital or Laboratory Nitrogen
(for power Operated Tools) (8) Hospital or Laboratory Acid Waste (9) Hospital
or Laboratory Compressed Air (10) Hospital or Laboratory Vacuum Air (11)
Special
Systems Note:
The inclusion
of the following will either increase the Basic Fee or Be treated as Special
Services. -Gas -Kitchen -Laundry -Decorative Fountains -Swimming Pool -Spa Pool
-Water Softening -Water Treatment (Distilled, Deionized, Reverse Osmosis)
-Central Chilled Drinking Water -Non-Potable Water (For Flushing Purposes)
-Waste Pulping -Vacuum Cleaning -Soap Dispensing -Lawn Irrigation -Site Sanitary
Sewers -Site Storm Water Sewers -Site Gas -Site Domestic Water -Site Fire
-Gasoline Dispensing -Hospital or Laboratory Infectious Waste -Hospital or
Laboratory Infectious Waste -Hospital or Laboratory Oral Vacuum - Hospital or
Laboratory Waste Anesthetic Gas - Hospital or Laboratory Helium -Hospital or
Laboratory Carbon Dioxide -Hospital or Laboratory Vacuum Cleaning -Other d.
Fire Protection Systems
P6 OF 7.
P7 OF 7.
(1) Sprinkler
Systems (2) Fire Protection Systems (3) Halon Systems (4) Other e. Transportation
Systems (1) Elevators (2) Escalators (3) Pneumatic Tubes (4) vertical and
Horizontal Conveyors (5) Moving Sidewalks (6) stage Equipment f. Automated
Monitoring and Control ( if not included under HVAC and Electrical Engineering)
(1) Automation and controls (2) Fire alarm systems (3) Master Antenna Systems
(4) Data Communication Systems (5) Telephone Systems (PBX) (6) Security System
(7) Special Signal Alarm Systems (8) CCTV Systems (9) Sound & Paging
Systems (10) Sound Masking Systems (11) Door Alarms (12) Intercom Systems g.
Energy Management h. Facilities Management i. Other Continued. More will be
listed as per your or the owner or the planners requested. Filed.ieeemobippcpe
at dot Gmail dotcom. Cc:JM,JW,BW,AL,GB,LV,MAH,SK,JB,DR,OD,JB,jb,bw,tl,jw,jm,mh,js,ppcpe.
21.05.2017.SUNDAY.
March 28,
2018,WED.
PAIPINCHEN.COM
CHENPAIPIN.COM.
P7 OF 7. END.
CC:
SYSKAHENNESSY.MOBI
JAROSBAUMBOLLES.COM,
ETC.
END.
FILED.