NEW AND COMING TWIN TOWERS ON "BIT' IN APRIL, THIS YEAR,, LOCATED NEXT TO TAIPEI RAILWAYS MAIN STATION ,SEE. MY CONCERNS AND MY QUALIFICATIONS.03282018.WED.


DATE: March 28, 2018,WED.

THANK YOU VERY MUCH.

I AM:

PAI PIN CHEN

PHILIP PAI-PIN CHEN, P.E.

PAI-PIN CHEN, P.E.

NEW YORK STATE PROFESSIONAL ENGINER WITH LICENSE NO. 60513 SINCE AUGUST 29, 1983 IN NEW YORK STATE, USA.

INTERNET, NYSEASIA, NYPEASIA, NYCEASIA.

HIGH RISE BUILDINGS ASSOCIATED.

1N YEARS 1979-1988, I ALREADY WORKED ON HIGH RISE BUILDINGS, FROM 60 FLLORS UP TO 100 FLOORS HIGH INCLUDING TWIN TOWERS IN LOW MANHATTAN DOWN DOWNTON, EMPIRE BUILDING, AT 34TH. STREET, MANHATTAN, NEW YORK CITY, SEARS TOWER, 100 FLOORS HIGH BUILDING, IN CHICAGO, AND THE BANK OF CHINA, 87 FLOORS HIGH BANKING BUILDING, HONG KONG, CHINA.

I TAIPEI, 101 HIGH RISE TOWER WAS DONE BY ARCHITECT MR. CYL, AND I AM:

PAI-PIN CHEN, P.E., NEVER TOUCHED THIS 101 BUILDING IN TAIPEI CITY, TAIWAN, REPUBLIC OF CHINA.

TWO 47 FLOORS HIGH RISE BUILDINGS I TOUCHED, ONE IN DONGHUA SOUTH ROAD, "FAREAST TWIN TOWERS', TAIPEI, AND TTII, TAICHUNG TAIWAN, ROC.

HIGHLY APPRECIATED.

BY THE WAY, FIRST TIME I AM GOING TO POST MY PREVIOUS PROJECTS

RIGHT IN HERE IN YOUR PLACE, DUE YOU ARE THE MAYER OF TAIPEI CITY, TAIWAN, REPUBLIC.

THANKS.

THE FOLLOWING INFORMATIONS POSTED ON MARCH 13, 2018.

DATE: March 13, 2018, TUESDAY.

陳栢彬, 陳栢彬.net.

PAIPINCHEN.COM, CHENPAIPIN.COM.

PAI PIN CHEN, NYSEASIA, NYPEASIA, NYCEASIA.

BUSSINESS, COMMERCIAL AND ECONOMICS.

POLITICS AND SOCIAL SERVICES, ASSOCIATED.

MANHATTAN, NEW YORK CITY, NY, UNITED STATES OF AMERICA.

MISSION CRITICAL TECH., CO-FOUNDER, DIRECTOR, ASIA, YEARS 1993-2003.

GREEN ENERGY AND POWER PROMOTION TASK FORCE SINCE YEARS 1988, 1989, 1990.

REAL ESTATE PACIFIC RIMS, ASIA, USA SINCE YEARS 1991/1992.

MISSION CRITICAL AND ESSENTIAL WORLDWIDE SINCE YEAR 1979.

MISSION ESSENTIAL AND CRITICAL WORLDWIDE SINCE YEAR 1971.

ETC.

MORE WILL BE POSTING IN HERE.

THANKS.

PLEASE NOTE:

THESE FOLOWING WORDS, REPEATED AND RE-POSTING AS SHOWN BELOW, CONTENTS AND TIME, DAY, ETC.

WHAT ABOUT:

Date: October 25, Sunday, 2015, at 11:36A.M.

Philip Pai-Pin Chen.

Keys for days.

I. Combat Climate Change, USA, Asia and Worldwide.

II. Green Energy & Power Promotion Task Force, Local and Worldwide, since November, 1988. (Via CTCI, CTI, and Taipei City, Taiwan)

III. Good days, peace, and happiness forever, USA and worldwide.

Most beautiful.

Most wonderful.

Most powerful.

Most thankful.

Thank you very much.

ArchitureEngineering.us

ArchitectEngineers.us

Syou Fen Lee

Opera, Voice, Music and Performing Arts, USA and worldwide.

PAI PIN & SYOU FEN CHEN

PHILIP PAI-PIN CHEN

nyseasia@gmail.com

October 25, Sunday, 2015.

1. My life always “Most beautiful, wonderful, and …… as you agreed or not”.

Key for the day.

2. Make my good day, today.

“As shown, on-Profit”, Partial, less is more, more or less, nyseasia.tv, 10242015.

Mission Critical, Broad, NY, USA, Asia and worldwide.

Opera, Voice, Music and Performing Arts, Worldwide, you Fen (Lee) Chen, after received the Award from Culture Society, Taiwan.

3. Please note:

Here the materials shown below was the resume I written with English and in Chinese, but even with my “super professional experience”, after I worked this “under-construction projects, during the six months, in year 1999, From June first 1999-October 25, 1999, I got No pay at all.” I hoped I can make US$3000.0 each month, but I got No pay, No earning due the Financial Crisis occurred in the “ChxxxTxxx and Associates Firm”, after 1999, 921, 7.1(or 7.9?) Magnitude Earthquake happened in Central Taiwan and in Entire Taiwan Island. The result of this “911” earthquake moved the the Tallest Mountain “ Jade Mountain” two(2) meters away from its original position since “millions” years ago.

What about my mind at this moment:

What I did about “As shown, non-Profit”, the small partial of my activities in the last 24 years since November First, 1991.

Amen!

God blessing all of us, you and all of you too!-Pai-Pin Chen, NYPE License no.60513, since August 29, 1983.

4. xxx1999( July xx,1999).

致函: Not shown, as per my concerns.

(407)台中市西屯區何厝,Deleted as my concern.

發文:

姓名: 陳栢彬, 陳栢彬.net.

Name: Philip Pai Pin Chen, P.E.

地址:Taichung, Taiwan,郵政信箱 1268(not completed)

Mailing Address: P.O. Box 126x, THU, Taichung, Taiwan

電話/傳真(Telephone/Fax #): (04)23-xxx-x89

手機(Mobile Phone#): 093x- 9xx-666; 0939-9x-9x9x

E-mail: NYSEASIA@HOTMAIL.COM;NYSEASIA@GMAIL.COM

_________________________________________________________________

主題:機電系統監工,協調與顧問職務.

Subject: “Coordination & Consultant”, Re-High Rise Building, 47 floors.

國際大樓.

CSR,建築師:

199961日到1015,大樓電力系統

分析及提出修正與建議,並於當年93ㄖ與xx工程,副總,X

工程等負責人開會並做出結論.

萬事如意

陳栢彬敬上

Dear Sir:

Deleted.

Sincerely yours,

Philip Pai Pin Chen, P.E

_____________________________________________________________________

RESUME

___________________________________________________________________

Consulting Engineers, International Services

Professional Experience專業經驗

1986 To Date -xx工程顧問科技有限公司(PCA : Power Chen & Associates, Inc.)

1993 To Date-美商傳道尖端科技股份有限公司(Mission Critical Technologies, Inc.)

1992-1993yr. - C.Y.Lee & Partners, Architects (Taipei, Taiwan).

李祖原建築師事務所(台灣台北市)

1989-1991yr. -China Technical Consultants, Inc (Taipei, Taiwan)

中國技術服務社,中鼎顧問工程股份有限公司(台灣台北市)

1984-1989yr. -Syska & Hennessy, Consulting Engineers. (NYC, USA),

希斯卡與瀚尼斯,顧問工程股份有限公司(美國紐約市)

1978-1984yr. -Jaros, Baum &Bolles, Consulting Engineers. (NYC, USA)

嘉洛士, 包畝 播魯士,顧問工程股份有限公司(美國紐約市)

1978yr. -Caretsky & Associates, Consulting Engineers. (New York, USA)

卡雷司基,顧問工程股份有限公司(美國紐約市)

1972-1975yr. -Chung Hsin Electric & Machinery Co.Ltd.(Taiwan):

中興電工機械股份有限公司(台灣,中和)

___________________________________________________________________

重要與特殊專業建築工程經驗:

(1)Goldman Sachs & Co.85 broad street, New York City, USA

美商xx公司,美國紐約市華爾街,金融業巨子, 擔任該公司專案工程師,

負責重電機房,電腦中心等設計施工維護等工作.

(2)高科技建築物建築群, 超大型土地與房地產開發興建

重電機與配電內容簡介:

美國高科技建築群..25MW 瓦斯透平機緊急發電機組,兩套

50MVA,110KV/13.8KV 變壓器,雙供電式 2500KVA變壓器共12.

High-Tech Building Complex, xxx, USA; Large area building complex with

Office building and high-tech. Lab.

Power Co. Sub-station, xx MVA/110KV/13.8KV. Double-Ended Unit Sub-stations,

2, x00 KVAX12units.Gas Turbine Type Emergency generator Power system,

25MW, (2x00kw/unit x10 sets).

(3)IBM顧客,執行長教育中心

IBM顧客,執行長教育中心,(複合式,教育用,教室,演講視聽廳,和高級旅館,

休閒工作度假兼容並蓄,全部配合IBM超級電腦共同運作).

IBM Customer Executive Education Center

Palisades, New York, USA

Building complex/Office + Show Room Computer data Center, Classrooms,

Studios, Hotel, 9,000KVA Electrical System with Three Unit Sub-Stations

(4)中國銀行,香港

中國銀行,香港,八十七層樓高摩天辦公大樓,國際著名"貝聿明建築師事務所",

貝聿明建築師, "JB & B 機電顧問工程師事務所", 共同規劃,設計,施工,

監造完工運轉..

主要電機系統簡介:

中壓11KV/低壓346V/200V, 英國系統;變壓器容量,2000KVA, 1500KVA,

1000KVA , 750KVA Unit Substations 分佈在特殊機房樓層,11KV配電系統

具獨 立電機間.低壓用電,採用英國系統 346V/200V.

Bank Of China, Hong Kong, China; 87 floors building designed by Architect,

Mr. I.M Pei and Parters, Architect firm; Electrical Distribution System:

11KVrimary/346/200V. 2,000KVA, 1,500KVA, 1,000KVA, and 750KVA Unit

Substations located on certain mechanical floors.

其他地標案例(Landmark list):

1. 施工觀查報告:台中市47層摩天大樓(TTII,Taichung 47th floors Tower-Field

Observation report on Construction Stage)

2. 中小型建築社區機電系統規劃(Building Complex and Area Development

Project)

3. 台北市敦化南路遠企中心,42層兩棟雙子星大樓Far-Eastern Plaza, Taipei

機電協調監工(1991-1992, 共計10個月Partial Project field Coordination).

4. 中國技術服務社,能源委員會,汽電共生推廣服務(Cogeneration power plants

Promotion Task Force: approx. 120 cogenerator units could be installed in Taiwan

And may produce 350MW electricity.

5. 大型藥廠研究中心(E.R. Squibb & Sons, Inc. Lawrenceville, New Jerky, USA)

Large high-tech Building complex and laboratory, 10MVACentral utility power

Plant and associated distribution.

6. 美國xx公司總公司(G& S & Company, Broad Street, New York

10MVA electrical system and super-computer data center

7. 美國IBM 公司, Customer Executive Education Center, Palisades, New York:

Building complex/Office + Show Room Computer data Center

Class Rooms+Studios+Hotel

9,000KVA Electrical System /Three Unit Sub-Stations

8. 美國摩根銀行60層大樓總部(Morgan Bank, New York City, U.S.A)

60 Floors intelligent office building for banking and trading.

9. 藥廠汽電共生系統(Burroughs-Wellcome, Greenville, North Carolina, USA):

15MW Cogeneration power plant parallel with Electrical Power Company.

10. 電力變電所Power Station-xxx Isxxxx, New York City, USA:

27KV/4160V newly built utility power substation

11. 美國ITT總部47層摩天大樓 (Building, 52nd.Street, New York City, U.S.A)

47+ Floors Building, Mech. and Electrical load analysis For Renovation

12. xx公司總部 超級電腦中心(Super computer data center, GS&Co., NYC):

7th. & 8th. Floors computer data center with 1,450KW UPS System and

Associated mechanical system.

13. xx公司布魯克林超級電腦中心(Super Computer Center,GS&Co. Brooklyn)

4,000KW UPS and Mech.System.

14. 金融期貨公司"7 Hanover"37層大樓 ,Low Manhattan,USA:

37th.floors building with trading floors

15. 美國麻省劍橋人造衛星接收站(Satellite Operation Station, Mass., USA)

Mech. & Elec. System for Station Operation.

16. 瑞士銀行電腦中心得(Swiss Bank, New York City,USA)

Dedicated computer data center for banking and trading.

17. 美國"Bankers Trust"銀行( Large Computer Data Center,NYC,USA)

大型電腦中心系統功能分析報告(UPS System Function Analysis)

18. 美國"Chemical Bank"銀行,Water Street,NYC,USA:

大型電腦中心系統功能分析報告(3,000KW UPS System Function Analysis

19. 中國銀行,87層樓高摩天大樓(Bank Of China, Hong Kong, China)

87 floors building designed by Mr. I.M Pei and Parters, Architect. Electrical

Distribution system: 11KV-Primary/346/200V. 2,000KVA, 1,500KVA, 1,000KVA,

And 750KVA unit Substations located on certain mechanical floors

20. 紐約市雷克辛大道 599,72層摩天大樓599 Lexington Avenue, New York City

The 72 Floors high rise building/each floor provided with Own metering devices.

21. 美國"Irving Trust Bank銀行",New York City,USA:

超大型電腦中心( Large Computer Dater Center with 3,000KW UPS)

Electrical -5KV Primary/480/277V Secondary. High-Tech. Intelligent Building

22. 美國廣播公司廣播室(American Broadcasting Company, Studio 23/24,NYC)

Heavy Lighting System with dedicated control system.

23. 高科技辦公室建築社區(High-Tech Building Complex,Maryland,USA)

Large area building complex with office building and high-tech. Lab., Power Co.

Sub-station-50 MVA/110KV/13.8KV., Double-Ended Unit Sub-stations,

12 sets of 2,500 KVA transformers, Gas Turbine Type Emergency Power system

25MW, (2500KWx10).

24. 美國"Pitney Bowes"總公司,貝聿明/董伯南設計(Headquater,Connecticut)

Building designed by I.M.Pei and Parters, Electrical Load-4,000KW

25. 美國"Philip Morris Inc."煙草公司,42nd.Street, New York City, USA

36 floors building, Electrical Load-5,000 KW.

27. 美國華盛頓特區一般行政大型General Services Administration,Washington,DC

Public Services Building-Electrical Load over 10MW.

28. 亞特蘭大,可口可樂技術總部,Technical Facility, Headquarter Complex,

The Coca Cola Company, Atlanta, Georgia, USA Electrical Load-9,000 KW

29. 亞特蘭大,可口可樂辦公室總部Office Building, Coca Cola Company, Atlanta,

Georgia, USA; Electrical Load-8,000KW

30. 美國Morgan Guaranty Trust Co.銀行,樓層辦公室,TennantsFloors, NYC, USA:

Tennant Floor Renovation for offices in downtown area.

31. 美國芝加哥希爾士100層摩天大樓,Sears Tower , 36th. Floor, Chicago, USA

36層辦公室機電系統設計監工(Mech. & Elec. System Renovation)

32. 美國紐約醫院發電機電力站(New York Hospital, Generator Plant Modification)

33. 美國紐約醫院,機房整修設計監工( Hospital Mechanical Room Renovation)

34.重要軍用民用建築物與設施

(1) 日月潭涵碧樓機電系統(1973)

(2)台北市士林官邸機電系統(1972-1975)

(3)金門馬祖外島勝力女神飛彈400MHZ, MG/發電機系統(1972-1975)

(4) 台電大樓 (1974)

(5) 其他辦公大樓與工廠(1992-1995)

CC: 陳栢彬,陳栢彬.net, 陳柏彬.com;

工程師.com; 電機技師.com;

專業工程師;中台房地產.com;

Filed: March 13, 2018,TUESDAY.

END.

RE-POSTING ON MARCH 28TH., WED. 2018, REGARDING THE NEW TWIN TOWERS WILL BE INVITING THE PEOPLE, GROUPS, COMPANIES, AND THE NATIONS , INCLUDING, USA, JAPAN, CHINA, AUSTRALIA, GERMANY, BRITISH, ETC. AS I ASSUMING, SUPPOSING IN HERE AND AT TIME NOW.

THANK YOU VERY MUCH.

IEEE.MOBI

LEEE.MOBI

SYSKAHENNESSY.MOBI

JAROSBAUMBOLLES.MOBI

JAROSBAUMBOLLES.COM

TAIWANCHINA.US

TAIWANCHINA.MOBI

REALESTATEASSOCIATED.COM

HIGHRISEBUILDINGSASSOCIAIED.COM

PAIPINCHEN.COM

CHENPAIPIN.COM

ETC.

FILED.

No comments:

Post a Comment