Friday, August 22, 2014

Peace and good weekend worldwide, Thank you so much. Philip Pai-Pin Chen,08232014, T.O.C. SEC. TITLE One. P.A.S.O.M Page A. P. One-1 B. S. One-1 Two LEGEND Two-1 Three D.O.P.S.

August 23rd. 2014
Philip Pai-Pin Chen.
Mission Critical & Essential, Broad, NY, USA, Asia & Worldwide.
Nyseasia worldwide; nyseasia USA, Asia & Worldwide.
Good weekend and nice days worldwide.

Please note: The Materials Shown, NOTFORCONSTRUCTION.
Thank you so much.
Draft:
Revised and updated required.

Partial shown only.
Please contact me via nyseasia at gmail dot com , should you look for more to fit your daily work or projects, thanks.



                    T.O.C.

SEC.                                     TITLE

     One.                  P.A.S.O.M                             
  Page

                            A.   P.                                                                           One-1
                            B.   S.                                                                              One-1

   Two                      LEGEND                                                                              Two-1

   Three                  D.O.P.S.

                            A.   Arrangement                                                                   Three-1
                            B.    Primary Switchgear.                                Three-2
                            C.    Main Transformers                                                        Three-3
                            D.    Generators                                                                     Three-4
                            E.     Low Voltage Switchgear.                                  Three-5
                            F.     Gen. / D. Switchgears.                      Three-6
                            G.    Technical Bus Switchgears                                          Three-7
                            H.    Generator Control Cubicles                                         Three-8
                            I.      Generator Metering Cubicles                                       Three-9
                            J.      Uninterruptible Power System                                     Three-10
                            K.     Protective Relaying                                                     Three-11
                            L.      Metering and Operators Devices                                Three-12
                            M.    Battery System                                                            Three-13
                            N.     Main Panel board                                                         Three-14
                            O.     Power Monitoring System                                           Three-15
                            P.      Grounding System                                                       Three-16
        

        IV                OPERATION OF POWER SYSTEM
    
                            A.     Normal Operation                                                       IV-1
                            B.     Abnormal Operation                                                    IV-2
                            C.     Parallel Operation                                                       IV-3
                            D.     Low Voltage Switchgear.                                  IV-3
                            E.     Generator / Device Switchgear.                        IV-7
                            F.     Technical Bus Switchgears                                          IV-13
                            G.     Relaying                                                                       IV-18
                            H.     Draw out Air Circuit Breakers
                            I.      Uninterruptible Power Systems                                    IV-19
                            J.      Main Panel board                                                          IV-21
                            K.     Power Monitoring System                                            IV-21
                            L.      Grounding System                                                        IV-22

         V                M.O.P.S.

                            A.     Medium Voltage Switchgear                                        V-1
                            B.     Transformers                                                                V-1
                            C.     Low Voltage Switchgear                                              V-2
                            D.     Uninterruptible Power System                                      V-5
                            E.     Main Panel board                                                           V-6
                            F.      Power Monitoring System                                            Five-6
                            G.     Grounding System                                                         Five-7
                            H.     Busways                                                                        Five-7
                            I.       Molded Case Circuit Breakers                                      Five-8
                            J.      Schedule of Periodic Inspection and Maintenance         V-8

         VI               INDEX OF EQUIPMENTY SHOP DRAWINGS
                            AND OPERATING MANUALS                                           Six-1

         VII              INDEX OF AS BUILT DRAWINGS                                      Seven-1



       Philip Pay-Pin Chen, nyseasia us; nyseasia NY
Nyseasiaworld.com since May 7th. 2014

Data File:08232014,ieeemobiat Gmail dotcom, paipinchen.com           



    

No comments:

Post a Comment