Wednesday, August 27, 2014

Peace & Good days Local & Worldwide. Highly appreciated. Philip Pai-Pin Chen.Life is like playing a violin solo in public and learning the instrument as one goes on.nyseasia us; nyseasia NY, Mission Critical, Broad, NY, USA Worldwide.08282014

August 28, 2014
Philip Pai-Pin Chen
Peace & good days Local & Worldwide.

Keys for the days.
Key one of two.
I.                   Samuel Butler, 19th century, said:
Life is like playing a violin solo in public and learning the instrument as one goes on.
Key two of two.
II.                Plutarch, ca.A.D. 100, said:
CHARACTER IS SIMPLY HABIT LONG ENOUGH CONTINUED.
Thank you so much.
NYSEASIA worldwide
Nyseasia USA Asia Worldwide
Combat Climate Change Worldwide
Green Energy & Power Promotion Task Force Worldwide
NYCRITICAL.com; NYESSENTIAL.com
Mission Critical & Essential, Broad, NY, USA, Asia & Worldwide.
Usahsr.com; usaamericanservice.com


August 28, 2014
Philip Pai-Pin Chen
Good days and peace worldwide.

Draft:
Revised and updated required.
Not for Construction.
Please contact head office located in Manhattan, New York City, USA prior ahead should you interest your projects in NYC or USA local & Nationwide. Or contact me via nyseasia@gmail.com for your concern. Thanks.-Philip Pai-Pin Chen-08/28/14
What about for todays and coming years.

Draft: materials shown below not for any purposes. Thanks.
“Brach checking OF BUILDING DESIGN PROJECT REVIEW”

NYSEASIA        Branch checking OF BUILDING DESIGN

                         PROJECT REVIEW

Project: Ph. 8569B HVAC Plant                    Project MGR.  P. Smith
       At NY Tech. Center                       To Pro. MGR.  8/28/14
                                              To Consultant:  /nyseasiaworld / 
Consultant: nyseasia.com- Engineers                    Prepared By:  Marlowe
                                              Phone NO.  X-8759
Discipline: Elect.  Phase: Preliminary

Notes: 1...  Review shall include comments pertinent
         to drawings. specifications & estimates
      2.  A written response is required to all the
         following comments within two weeks

ITEM   COMMENTS

    1.  General:
          a.  No written response received on prelim. Comments dated 7-27-14 as
              of to date. Item #2 through #6 not complying.

     2.  Title block:
          a.  Indicate the drawing title, also contract number & sheet no.
          b.  Provide scale & date

     3.  Provide or show removal works in the drawing.

     4.  Mechanical Room:
          a.  Two motors shown unidentified.
          b.  Identify the 2-Electric. Panel shown.
          c.  Identify the floor plan shown and scale.
          d.  How do you intend to install the” 31/2”C “shown.
          e.  Is the combination starter shown integrated w/ the equipment.


Page 2

DDP/D&C/DPOP                       Branching of  OF BUILDING DESIGN

                         PROJECT REVIEW

      5.  One line Diagram - Exist. MCC:
           a.  Identify the circuit. no. & the fuse & starters ratings.
           b.  Indicate the size of wires to be run in the existing conduits.

      6.   Is there any lighting layout. See comment item #3 of Prelim. Submission
          dated 7-12-14.

      7.   Incomplete electrical data on mechanical schedule.

      8.   Provide symbol list required.
     
      9.   Indicate “How do you intend to tap the exist. SWBD. “A1” to the new
          sub-breaker CB-8.

      10.  Show concrete encased details - prefer bus duct.

      11.  Estimate:
           a.  Branch feeders 100 A, 200 A, 300 A- not shown in drawings.
           b.  provide a detailed breakdown of estimates on chiller feeders.
           c.  Motor starter shall be by others.
    


               PROJECT REVIEW

PREPARED BY: A.P.

Item                     Comments

   1.   Check and coordinate with “Con-Ed. “requirements regarding the new
        Electric service requirements.
   2.   Show location of panel LP1-MCC2-ME1 & MR3 , and identify, if existing.
Page 3

    3.   Provide a mounting details of the lighting fixtures shown & indicate
        manufacturer & circuit no.

    4.   Check space location of the new switchboard “C1”.

    5.   MCC - One Line Diagram:
         a.  Identify circuit no.
         b.  Indicate new fuses ratings, & its starters.
         c.  Indicate the feeder sizes within existing conduits.
         d.  Existing conduits to P-1,P-2,P-3,P-4,P-5,P-6. Check if existing
            conduits are reusable.

     6.   Show smoke detectors if required.

     7.   Provide a detailed breakdown of estimates.
More will be added ASAP-Philip Pai-Pin Chen.


     2014828
Philip Pai-Pin Chen, NYSEASIA Worldwide

 陳柏彬                     
Mission Critical & Essential, Broad, NY, USA, Asia & Worldwide.
                              

Mechanical and Electrical consulting Engineers
機電顧問工程業務


重要工作範圍建議事項 (Suggested Scope of Work ):
1. 計劃, 設計和監督 (Planning, Design and Inspection)
2. 專案管理 (Project Management)
3. 溝通與協調 (Communications and Coordination)
4. 操作運轉與維修 (Operation and Maintenance)
5. 其他,(配合業主要求)

                 技術服務 
        服務/工程/管理/電腦輔助設計
       Services/Engineering/Management:
       
空調工程(HVAC Engineering):
調溫暖房;通風;空調;製程管路;工業排氣;儀表控制;能源再生;熱能再生;無塵室.

2.電機工程(Electrical Engineering):
建築物電力;緊急發電廠;不斷電系統;特殊接地系統;電磁干擾防護;照明;照明控制;配線管理.

3.配管工程(Sanitary Engineering):
 (雨水與污水)下水道排水系統;自來水系統;瓦斯系統;醫院瓦斯系統;處理過之水供應系統;壓縮空氣及真空系統;噴泉及游泳池.

4. 區域動力共用工程(Site-Utilities Engineering):
電力配電系統;供水,處理及分配;蒸汽,冷卻水及熱水供應分配;區域排水系統;廢水處理,重用,或廢棄.

5.建築物電子系統工程:
(Building Electronic Systems Engineering)
自動監視與控制系統;防火管理;保全管理;通訊網路整合;影音系統.

6.通訊工程(Communications Engineering):
電信通訊;局部區域網路;辦公室自動化整合;光纖應用;聲音/資料傳輸管理.

7.控制系統(Control System Engineering):
分散式直接數位控制;能源管理;製程控制;功能最佳化;建築物內網路整合.

8.救生與消防
(Life & Fire Safety Engineering)
符合法規;偵測與警報系統;滅火系統;瓦斯鎮壓系統;煙火意外撤離與控制;緊急通訊.

9.中央共用動力系統工程:
(Central Utilities Engineering)
高溫熱水與蒸汽;發電廠(燃煤,,瓦斯);冷凍廠;汽電共生廠;區域性暖房/冷卻系統;空氣污染防治;管線分配;焚化爐.

10.建築物輸送系統:
(Building Transport Systems Engineering)
交通量分析;電梯,電扶梯,小型送貨電梯;走動式電動扶梯/舷梯;氣動傳輸管,自走式運輸車,旋轉式輸送帶,旅客/貨物輸送帶;空氣傳動與手動式收集系統;固體廢棄物處理;髒污衣物清洗系統.


11.設備與裝置管理(Facilities Management):
電腦化維修程式;系統操作與維修手冊;預防性維修與工作程序計劃;維修人員安排;指導與員工訓練;建築設備管理講習會;設備與建築物條件分析.

12. 能源管理(Energy Management): 
建築物能源保存分析.

13. 電腦輔助設計(Computer-Aided Design):
電腦電腦化能源分析;規範電腦化作業;化應用顧問;電腦化製圖與設計.

14.營建監造
(Construction Inspection & Supervisory)
15.More will be added as per request.