Sunday, July 27, 2014

NYSEASIAWORLD Worldwide, Philip Pai-Pin Chen,Mission Critical , Broad, NY, USA and worldwide. Timing and time in life time is very important issues for me.Should be back on line as soon as possible, paipin chen, July 28, 2014

July 28, 2014
Philip Pai-Pin Chen
Good days and peace worldwide.
Third issued, Thanks.
Keys for the days.
I.                   Key one of three:
Albert Szent – Gyorgyi said:
Discovery consists in seeing what everybody has seen and thinking
What nobody has thought.

II.                Key two of three.
Francois de La Rochefoucauld, 17th. Century, said:
Weakness is a greater enemy to virtue than vice.
III.             Key three of three.
Johann Wolfgang von Goethe said:
Fools and the wise are equally harmless. It is the half-fools and the half-wise
That are dangerous.
Thank you very much.
What about my physical and mind today.
Primary for daily life and the others.
A.Actions, Consequences, Processing, and How to face and solve the difficulties.
B.     Healthcare for myself.
1.      Few days ago, due too heavy loads, I twisted and hurt my joint at right arm.
2.      Yesterday morning, I went to emergency room and took two shots to kill the pain.
3.      So far ok, even so, I still can type words as shown, but I can’t move-up my right hand easily.
4.      See coming days, should I go back hospital for another treatment-checking.
5.      Highly appreciated.

Nyseasia us; nyseasia NY
Nyseasia
NYSEASIAWORLD Worldwide
Nyseasiaworld.com, since May 7th. 2014.
Highly appreciated.




July 28, 2014
Philip Pai-Pin Chen
Should you interest on the materials shown below please call us or emails to me, prior you intend to do any actions and applying the materials listed.
Draft: Revised and updated required.
Not For Construction-Philip Pai-Pin Chen.
Not for any purposes-Philip Pai-Pin Chen.
High Rise Commercial Tower Building (HRCTB)
 Date: July 28,, 2014                     PPC/ADSC
ADSC             

From: 陳柏彬  Philip Pai-Pin Chen, paipin chen               Director / NYSEASIA Worldwide
   PROPOSAL建議書                 DRAFT(Revised and updated required, Not for construction) 
RE: Mechanical, Electrical & Plumbing Related
Subject: M&E Drawings Update and Man Power Arrangement
                 BID DOCUMENTS
                      AND
            PURCHASE SPECIFICATIONS
                      FOR
              Electrical Distribution System
I.     Introduction
This proposal for operation and maintenance manual will be developed as a guide and system familiarization hand book for the operation and M&E personnel of the HRCTB, Location of the project.
This system- oriented (O&M) instruction Manual is not intended to replace contract documents, shop drawings, as-built drawings, or the equipment manufacturer's operating and maintenance instructions, but is a supplement to those documents.
A system-oriented operating Manual is a management tool. It helps communicate to each person working in the HRCTB, the designer's intentions about how to operate the systems under normal and emergency conditions. This manual is broken down into separate sections for each Hotel, Office, and Car-Park space with its own table of contents as outlined below.
Contained in this proposal of O&M Manual is the following information:

II.  FACILITIES/LOCATION
________________________________________
III. Scope of Work工作範圍
1.      Space Location (WHERE )
2.      TRADE
A.       Mechanical , Electrical and Electronics
1). Electrical Power
_____________________________________________________________________





     DRAFT (Not for construction, Revised and updated required)
      Training Manual                           PPC/ADSC
Electrical Power System
        July 28th. 2014
_____________________________________________________________________
      TABLE OF CONTENTS
Section                Title                                Page
I          PURPOSE AND SCOPE OF MANUAL
A.            PURPOSE
B.            SCOPE
  
II         LEGEND

III        DESCRIPTION OF POWER SYSTEM
A.        Arrangement
B.        22.8 KV primary switchgear  "  "
C.        Main Transformers
D.        Low Voltage Switchgear ““, "  ", & "  ".
E.         Protective Relaying
F.         Metering and Operators Devices
G.        Power Monitoring System
H.        Main Panel board
I.           Grounding System

IV        OPERATION OF POWER SYSTEM
A.            Normal  Operation
B.            Abnormal Operation
C.            Parallel Operation
D.            Low Voltage Switchgear
E.             Relaying
F.             Draw out Air Circuit Breakers
G.            Main Panel board
H.            Power Monitoring System
I.               Grounding System



V        MAINTENANCE OF POWER SYSTEM
A.            22.8 KV Medium Voltage Switchgear
B.            To be added.
  



2) Electrical Lighting
3). Electronics
a.      Fire Protection
b.      Security
c.      Telephone/ Data Processing /Telecommunication
d.     CCTV
e.      Energy Management
f.       BAS (Building Automation System)
g.      The others

1). HVAC
a.      Chillers
b.      Air Handling Units
c.      Fan coils
d.     Cooling Towers
e.      Piping
f.       Air ducts
g.      Control and monitoring systems
h.      The others

2). Plumbing
a.      Pumps
b.      Piping
c.      Devices
d.     Control and monitoring system
e.      The others

Project Name: As shown, (Not for Construction, Draft)

Re:  M&E SYSTEM DATA
____________________________________________________

I.            Building Data                      DRAFT
A.            Building Type and Primary Functions:
B.            Location:
C.            General:
1.            Gross Area
2.            Net Occupied Area
3.            No. of Floors

II.         Lighting
A.            What are major area lighting levels and types?
Area                      Type   Watts    FC    Control

1.        Hotel
2.        Office
a.            Executive Offices
b.            General Offices
c.            Conference Rooms
d.           Corridors
e.            MER's
f.             Lobbies
g.            Toilets
h.            Exterior
i.              Parking
_______________________________________________________
Legend:  TC - Time clock
         LS- Local switching (How Local)
         D - Dimmer
         MH - Metal Halide
         F - Fluorescent
         I - Incandescent
         MV - Mercury Vapor
         HPS - High Pressure Sodium
______________________________________________________
B.            In general, what type of wall covering and what colors are in major areas?
Area                               Wall Covering & Color
Executive Offices
General Offices
Conference Rooms
Corridors
Lobbies
Parking Garage
C.            What type of ballasts are being used?
D.            What voltage are incandescent lamps rated for?
E.             What sequence of lighting controls is presently used? That is, how many hours each day is major area lighted and what "cleanup program” lighting is presently employed?
F.             Is interior lighting on the exterior of the building separately controlled for possible shut off on bright days?
G.            Do fluorescent fixtures use reflective covers to maximize light refraction? If so, are they maintained clean?
H.            Is lighting presently task oriented or modular?
I.               Is furniture integrated lighting presently employed in the facility?
J.               Describe major lighting fixture types used. (Watts, dimensions manufacturer, lightshield, voltage, etc.)
K.            What stair lighting methods and control are used?
L.             What decorative lighting can be reduced or eliminated?
M.           Is exterior lighting under TC or photocell control?
N.            Can exterior lighting be reduced or eliminated?

3.        Car-Park

III.      Power
A.        Obtain utility rates, billings and demand interval for past year.
B.        Has a recent rate study been made to determine whether or not the facility has the most efficient rate and meter arrangement?
C.        Is voltage regulation maintained within standard limits? (+/- 10%)
D.        Does large refrigeration equipment utilize a demand limiter?
E.         Is there a central plant? What is the power factor? Does the utility rate schedule have low pf penalty or high pf incentive clause?
F.         Is load shedding presently employed to conserve energy and limit demand? If so, describe method.
G.        What major heavy loads are operated during peak demand periods?
H.        Do mechanically refrigerated drinking fountains remain on during non-working hours? (Manufactures estimate drinking fountains operate on an average of 10 minutes each hour).
I.           Are elevators and escalators kept operating 24 hours a day?
J.           Are there electric kitchens on the premises? If so, is it used during peak demand periods?
K.        Are there emergency generators in the facility? If so, are they used during peak demand periods?
L.         When and what method of exercising and testing the generators are used?
M.       Are major distribution transformers operating on center tapes?
N.        What is the temperature in the transformer and switchgear rooms?
O.        Are motor starter contacts maintained?
P.         Are motor sizes matched to equipment shaft sizes to operate at the most efficient point?
Q.        Are loads balanced over all phases?
________________________________________________________________
R.        Load Data
1.        List estimated sizes of controllable loads (For limiting or shedding) in kW.
a.        Exhaust and Intake fans
b.        Re-circulation fans
c.        HVAC compressor motors
d.       Chiller motors & pumps
e.        Type of chillers
f.         Hot water heaters
g.        Duct heaters
h.        Refrigeration
i.          Pool heaters
j.          Boilers
k.        Fluid pumps
l.          Heat pumps
m.      Furnaces
n.        Battery Charges
__________________________________________
Survey questionnaire for the Design of Electrical Systems
Note: Modify the following to suit the particular project for which information is being sought.

Project Name: As shown above (Draft).
A.  GENERAL
1.        What are applicable Codes?
2.        Survey of existing utilities on and in vicinity of site indicating size and location of electrical, telephone and miscellaneous communications lines.
3.        Is there any requirement for submission of plans and specifications for approval by municipal agencies?
4.        Are Design and specifications to be prepared on local or foreign equipment? If local, obtain information on local equipment.
5.        Description and criteria of security, national emergency and fall-out protection systems.
6.        Is the project site located in an earthquake zone? What seismic rating is the zone?
B.  ELECTRIC UTILITY SERVICE
1.        Available service voltages:
Volts:       Phase:        Wire:         Hz.
2.        Available short circuit:
3.        Available service entrances? Indicate number, types and locations.
4.        What is the experienced percentage fluctuation of the Utility system voltage and frequency during normal operation?
5.        What is the experienced frequency and duration of scheduled and non-scheduled power outages in the vicinity of the site?
6.        What is the frequency, duration and magnitude of "brownouts" (Intentional Utility system voltage reduction)?
7.        What are the largest across-the-Line motors acceptable to utility company?
8.        What is the Division of work between Utility and building owner? Utility Co. back charges? (Describe).
9.        Overhead or secondary Utility service to site?
10.    Primary and secondary service metering and rate schedules for each.
11.    Is billing conjunctive (sum of instantaneous total maximum demand) or totalized (sum of highest maximum demands)?
12.    What is the length of the period used to determine the demand?
13.    What are Utility Company requirements for transformer vaults, cables, metering, approvals, shop drawings, others?
C.  TELEPHONE SYSTEM
1.        Is there a specific location or choice of locations where service will enter the site?
2.        Is service to the site overhead or underground?
NOTE:  USE PARAGRAPHS 3-7 IF LOCAL TELEPHONE COMPANY IS PROVIDING SYSTEM:
3.        What is division of work between utility and owner on incoming service?
4.        What are telephone company requirements regarding service termination space and internal distribution.
5.        What is the minimum conduit-bending radius?
6.        Where will power be required? Normal or emergency?
7.        What special requirements does the owner have regarding the telephone system?
NOTE: USE PARAGRAPHS 8-18, WHERE PRIVATE SYSTEM WILL BE DESIGNED BY CONSULTING ENGINEERS.
8.        What type of service is available?   Describe:
9.        What type of signaling will be used?  Describe:
10.    What type and gauge of cable will be terminated on the Main Distribution Frame (MDF)?
11.    What type of central Office (CO) side MDF protection is required?  Describe:
12.    What type of trunk service is available?  4-wire; 2-wire; other; Describe.
13.    What is the maximum loop resistance including station or key equipment?
14.    Are repeaters required?
15.    Will precise tone multi-frequency dialing be accommodated by the Central Office? Yes ( ), No ( ), If yes, what standards should be used?
16.    What is central office and national system data transmission rate in baud or bits per second (bps)?
17.    How do you want the traffic and grade of service calculations presented?
18.    Other than BSP (Bell System Practices) do you have any other standards or regulations we should be aware of?
D.  GENERAL REQUIREMENTS
1.        Systems and Equipment Criteria
a.        Lighting:  U.S. Illuminating Engineering Society (IES): U.S. Federal Energy Administration (FEA) ; British Standards ; Other ; describe:
b.        Lightning Protection: U.S. National Fire Protection Association (NFPA) (); British Standards (); Other (); Describe:
c.        Equipment:  U.S. with Underwriters' Label (); Other (); describe:

E.   BUILDING UTILIZATION VOLTAGES
1.       Volts,      Phase,      Wire,      Hz. For: Hotel
2.       Volts,      Phase,      Wire,      Hz. For: Office
3.       Volts,      Phase,      Wire,      Hz. For: Car Park

F.   STANDBY EMERGENCY GENERATOR
1.            The following is a list of systems and equipment generally placed on emergency standby power. Please review and modify if required.
a.        Exit lighting
b.        Partial - corridor, stair and selected area lighting
c.        Elevators (on selective basis- one at a time)
d.       Refrigerators
e.        Fire pumps
f.         Sewage and sump pumps
g.        Telephone and communications system
h.        Alarm systems
i.          Security systems
j.          Control air compressors
k.        Generator room appurtenances

G.    OFFICE FOLLR POWER DISTRIBUTION
1.        Is the flexibility of an under-floor distribution system required?
2.        What areas or load concentrations exist requiring special provisions (Such as special guestrooms, VIP Room, etc.).
H.   SPECIAL SYSTEMS FOR POSSIBLE INCLUSION
1.        Equipotential Ground System
2.        UPS
3.        Isolated Power System
4.        Manual Fire Alarm System
5.        Smoke and Fire Detection Systems
6.        Lightning Protection System
7.        Grounding System
8.        Security and Watch Patrol System
9.        CCTV (Closed Circuit Television)
10.    Intercommunication System
11.    Public Address System
12.    Sound System
13.    Television System
14.    Radio System
15.    Satellite System
16.    Helicopter related
H.     More will be listed as per owner’s request- Philip Pai-Pin Chen.
Nyseasia us; nyseasia NY
Nyseasia worldwide.
Nyseasiaworld worldwide.
Ieeemobi, leee.mobi.
Syskahennessy.mobi;
Jarosbaumbolles.mobi
Cloudasia.us.
Green energy and power promotion task force, mission 2014, 2024.
Winertakeall.com, winerstakeall.com
Usahsr.com; usaamericanservice.com; usaamericansservices.com

Mission critical, broad, NY, usa and worldwide.

No comments:

Post a Comment