Monday, July 28, 2014

You cannot be both fashionable and first-rate.i am with you all time no matter what. i love you. thank you so much, NYSEASIAWORLD Local & Worldwide,Philip Pai-Pin Chen,July 29,2014

July 29, 2014
Philip Pai-Pin Chen
Good days and happiness forever, USA local, National & worldwide.
I.                   Key for the days, and also for you, me, and all of us.
Logan Pearsall Smith said:
You cannot be both fashionable and first-rate.
II.                NYSEASIA.com
1.      NYSEASIA Worldwide.
2.      NYSEASIAWORLD Worldwide
3.      NYSEASIAWORLD local & worldwide.(happy birthday, July 29,2014)
Thank you so much.
Please note: the following materials shown below:
I.                   Not for Construction.
II.                Not for any purposes.
III.             Revised and updated required.
IV.             Should you interest in the data, information, and materials listed, please contact the head office in Manhattan, New York City, USA ,far prior you intend to apply these listed materials for your “work or projects”- be aware of this, Materials shown NOTFORCONSTRUCTION also not for any purposes.
V.                Highly appreciated for all since we are/were on line since 1979, earlier or later.
Mission Critical, Broad, NY, USA Worldwide

SPR/Special Project Related
HVAC (5 to 10% of Total)
SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN PHASE
1.            Prepare Outline Description including:
2.            Space requirements
3.            Sketches where required.
4.            Construction cost estimates in dollars per sq.
5.            Recommendations for studies and reports to be included in subsequent phases of work

SPR/Special Project Related
HVAC (20-25% Total)
SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN PHASE
A.  General
B.  Scope of Work
1.  Update and confirm SDD Phase of work.
2.  Prepare Load estimates
a.            Using H-Load Program
b.            Use of hand Cal.
3.  Design criteria
4.  Energy analysis
5.  Drawings
a.            Abb. & sys. List
b.            Typical Fl. Plan
c.            Establishing space requirements and accessibility
d.           Establish weights of major equipment and average loads
e.            Typical AC system flow diagram
f.             Applicable flow and riser diagrams (air & Water).
6.  DD (Preliminary) Specification.
7.  Cost estimate
File: PPC. Memo. #04042014, ok99
CC: PM of Each Trade

Philip Pai-Pin Chen, NYSEASIA Worldwide

Date: July 28, 2014
                 Memo. # N/A            PPC/ADSC
Subject: ELECTRICAL/ SCOPE OF WORK GUIDE FOR SCHEMATIC DESIGN

Re:  HVAC/ M&E Design Input Data
Subject – HEAT LOSSES FOR TYPICAL ELECTRICAL EQUIPMENT
1.            TRANSFORMERS
A.                General – Approximate loss of 15KW per 1000 KVA.
B.                Dry Type, 600 volts and under : 30 thru 500 kva over
600 volts: 750 thru 1000 kva.
Approximate % Total loss
80Degree Temp Rise; 115 Degree Temp Rise; 150Degree Temp Rise; KVA Range
  2.58%              2.98%               4.20%          30 thru 75
  2.10%              2.30%               3.50%        112.5 thru 225
  1.45%              1.64%               2.30%        300 thru 500
  1.13%              1.32%               1.55%        750 thru 1000
l  Square D Company

C.                Oil Filled
Approximate % Total Loss
5/8.33 KV;       25KV class;        35 KV class;           KVA Range
5800 watts       6300 watts         6880 watts              500KVA
7500            8750              9400                   750
9900           10500             11500                  1000
14600          15400             16300                  1500
18500          19400             19900                  2000
22500          23900             24700                  2500

* Westinghouse, Catalog 47-121 page 4, PLAZATRON NETWORK

2.            UNIT SUBSTATIONS
A.            Transformers – Approximate loss of 15 kw per 1000 KVA
B.            Breakers (460v)- Approximate loss of 400w per breaker
C.            Breakers (4160v) – Approximate loss of 800w per breaker
l  Electrical Construction and Maintenance

3.  MOTOR CONTROL CENTER
A.            General – Approximate loss of 200w per vertical section
B.            Components
MOTOR CONTROL CENTER COMPONENTS
Component;     Size/Rating        Approximate Loss BTU per Minute
Magnetic         Size 1                 0.9
Starters          Size 2                 2.5
3                                                                        4.5
4                                                                        8.0
5                                                                        17.0
Circuit Breakers     100 Amps              0.5
                225 thru 600 amps          9.0

Fusible Switches     30 Amps               0.5
                   60 Amps               1.0
                  100 Amps               2.5
               200 thru 600 Amps           9.0
Control Transformers    50VA                0.5
                     100VA                0.9
                      150 VA               1.3
                       300VA               2.6
                       500VA               2.9
                       750VA                4.3
                       1000VA               5.7
* S. D. Company
4. more to be listed.
Usaamericanservice.com; usaamericansservices.com
Usahsr.com; poweressential.com; BatteryAsociates.com
PowerPlantWind.com; PowerStationWind.com; PowerStationSolar.com
FaceCritical.com; FaceEssential.com
Mission Critical & Essential Worldwide.

Filed: ieeemobippcpeAT Gmail dotcom, dated 07292014-ppcpe.

No comments:

Post a Comment