September
25, 2014
Philip
Pai-Pin Chen.
Peace and be
happy, No worry USA, Local & Worldwide.
What in my
mind today.
Key for the days.
Key one of
three.
1. Confucius, ca. 500 B.C. ,said:
It is humans
that make truth great, not truth that makes humans great.
中台房地產.tw;陳柏彬;工程師.com; 電機技師.com;中台房地產.com;
Preparing
back on line as soon as possible-Philip Pai-Pin Chen (NY LN# 605XX).
Thanks.
Mission
Critical, Broad, NY, USA Worldwide;
Mission
Essential & Critical, Time, Life, Space, Broad, NY, USA Worldwide.
Usahsr.com;
usaamericanservice.com
Combat
Climate Change Worldwide.
Green Energy
& Power Promotion Task Force Worldwide.
CloudAsia.us, PowerStationSolar.com; PowerPlantWind.com, etc.
CloudAsia.us, PowerStationSolar.com; PowerPlantWind.com, etc.
paipinchen.com, 09252014
Part one of
two for today’s posting.
Draft, one
of two.
Revised and
updated required.
Please note:
1. The following materials shown Not for any
purposes, Not for Politicians, Economists, Voters, you, me, and all of, purely
for the “Words” since the words created by human beings, followed the senses of
my own.
2. Not for Construction to.-Philip Pai-Pin Chen.
Re; “NYSEASIA
us; NYSEASIA NY”, at beginning and while log on, not being and been shown at beginning,
in Google, AOL, and Yahoo in yesterday, and few months ago.
Winertakall.com
; winerstakeall.com.
Only five
days left, 31 days left and 29 days left for this month September October, and November Prior the the most
important day, November 29, 2014.
So 5 +30+29
=44 days, less than 45 days for you to chase you’re winning.
Do and work harder,
with more effectively , the tools, the methods, the relationships, the
technics, the medias, the news, the waves , the sun, the wind, the cloud, the
air, and the most important is the people you know and you may not know but due
your past, now and coming 45 days efforts in public and private fields.
I always
with you, you all since 1971.
The winners will
take all in years 2015, 2016, 2017 and 2018.
You want to
be in the group of the winning, of course.
Good luck,
everyone, USA Local & Nationwide.
Face Book:
nyseasia us; nyseasia NY; Philip Pai-Pin Chen.
G-Blogger:
NYSEASIA
WordPress:
NYSEASIAWORLD.
Xuite:
NYSEASIAWORLD Chapter one.
Part two of
two for today posting.
Draft, two
of two.
Revised and
updated required.
Please note:
The
following materials shown Not for Construction,
Day 4,
contract checklist, continued, 09252014.
September 25th.
2014
Philip
Pai-Pin Chen
Peace and
god days worldwide.
What in my
mind at this moment.
Keys for the
moment and forever.
Key two of
three.
2. Nicolas
Charles Trublet said:
To select
well among old things is almost to inventing new ones.
Key three of
three.
3. Mark Twin
said:
Loyalty to
petrified opinion never yet broke a chain or freed a human soul.
Thank you
very much.
NYSEASIAWORLD
Local & Worldwide.
So, here is
what about!-Thanks.
I.
Philip
Pai-Pin Chen;
II.
Pai-Pin
Chen; ieee.mobi, leee.mobi, SyskaHennessy.mobi, JarosBaumBolles.mobi,
TaiwanChina.mobi; TaiwanChina.us, AsiaCritical.com, AsiaEssential.com,
MissionCriticalAsia.com, etc.
III.
PaiPinChen.com.
Nyseasiaworld
worldwide.
Please note:
The materials shown below Not for any purposes and also Not for Construction.
Please
contact me or the head office in NYC, New York, USA should you have any
suggestions or planning for your coming projects. –Thanks. Philip Pai-Pin Chen.
Draft.
Revised and
updated required.
CONTRACT
CHECKLIST
This
checklist was reviewed on September 19, 2014
, at N/A , between Mr. /Ms. N/A of “NYSEASIAWORLD.com and Associates” and Mr.
/Ms. N/A Of “Investors,
and the associated bank and banks” ,
and will be used as the basis of the Agreement between both parties.
When agreed
to by both parties, this contract list can be attached as a rider to the
Agreement; and therefore, be a part of the Agreement.
1. Project Description
1.1 Type of Project
1.2 New and/or Existing Building(s)
1.3 Type of Construction (i.e., steel and concrete, concrete,
etc.)
1.4 Number of Buildings
1.5 Base Building Core and Shell and/or Tenant Work
1.6 Gross Square Feet Areas of Building(s) and Site
(Acres)
Day one, contract checklist, nyseasiaworld,
09222014.
P1 of 13 (continued).
1.7 Location (address if available) City, State,
Country
1.8 Estimated cost if established
1.9 Method of preparing documents and bidding (i.e.,
Fast track, multiple prime contract, etc.)
Work Additional Comments
2. Scope of
Services Included Engineering
Services
a.
Schematic Design Phase*
(1) Studies-Engineer will study
the following alternative
systems including advantages,
disadvantages, budget cost
and recommendations.
-HVAC
(INCLUDING CENTRAL PLANTS) (LIST)
-ELECTRICAL
(List)
-SANTARY
(List)
-VERTICAL
TRANSPORTATION (List)
-FIRE AND
LIFE SAFETY (List)
-SECURITY
(List)
-COMMUNICATIONS
(i.e.,data, etc.) (List)
-Other
Notes:
(a) Recommendations for further studies
in subsequent studies in subsequent
phases of project.
(2) Survey of existing facilities and conditions and
report of findings.
(3) verification of accuracy of drawings or other
information furnished by owner.
(4) Design Criteria including applicable codes and
standards, and systems descriptions.
(5) Space conditions and weights for M/E and other
applicable trades equipment.
(6) Outline Specifications.
(7) System Flow and/or Riser Diagrams, block layouts
of M/E and major spaces.
Day two, contract checklist, nyseasiaworld,
09222014.
P2 of 13 (continued).
(8) Part or full typical floor layout for:
-HVAC
-ELECTRICAL
-SANITARY
-FIRE PROTECTION
(9) Major equipment sizing.
(10) Discussions and confirmation
with
applicable public agencies
and
utility companies concerning
project
and services.
Note: This
should be specifically
discussed with client since on some
projects (especially in the Schematic
Design Phase ) we are directed not
to contact anyone regarding the
project.
(11) Preparations of estimated
construction costs on a square foot
basis.
(Note:
This may be provided by Engineer,
Construction Manager, General Contractor
or Cost Consultant. )
b. Design Development Phase (Based on
Approved Schematic Design Phase) *
(1) Additional Studies for:
-HVAC (List)
-Electrical (List)
-Sanitary (List)
-Vertical Transportation (List)
-Automation (List)
-Fire and Life Safety (List)
-Security (List)
-Communications (List)
-Other (List)
Day three,
contract checklist, nyseasiaworld, 09222014.
P3 of 13 (continued).
(2) Outline Specifications (if not furnished
during Schematic Phase ) or first pass
using final specifications. If final
specifications are to be used, verify format.
(3)
Updated
drawings confirming space
conditions, weights, equipment and system
sizing and selection.
(4) Updated Design Criteria.
(5) Updated utility information.
(6) Updated estimated construction costs.
(Note: This may be provided by Engineer,
Construction Manager, General Contractor
or Cost Estimator.)
c. CONSTRUCTION DOCUMENT PHASE
(Based on approved design development Phase)*
(1) Additional Studies for:
- HVAC (List)
- Electrical (List)
- Sanitary (List)
- Vertical Transportation (List)
- Automation (list)
- Fire and Life Safety (List)
- Security (list)
- Communications (List)
-Other (List)
(2) Final Specifications and verify format.
(Unless already established in Design
Development Phase)
(3) Final Drawings - verify size of drawings.
(4) Verify if separate Drawings and/or
Specifications are required for :
n Tenant Areas
n Special System (i.e., Security, etc.)
Day four,
contract checklist, nyseasiaworld, 09222014.
P4 of 13 (continued).
Filed. ieeemobippcpe@gmail.com’; nyseaia@gmail.com; PaiPinChen.com,09252014
No comments:
Post a Comment