September
24th. 2014
Philip
Pai-Pin Chen
Peace and
god days worldwide.
What in
my mind at this moment.
Keys for the
days.
Key one
of two.
1. Wilhelm
Stekel said:
The
mark of the immature man is that he wants to die nobly for a cause, while the
mark of the nature man is that he wants to live humbly for one.
Key two
of two.
2. Nicolas
Charles Trublet said:
To select
well among old things is almost to inventing new ones.
NYSEASIAWORLD
Local & Worldwide.
So, here
is what about!-Thanks.
I.
Philip
Pai-Pin Chen since 1984; Pai-Pin Chen since 1947
II.
Pai-Pin
Chen; ieee.mobi, leee.mobi, SyskaHennessy.mobi, JarosBaumBolles.mobi,
TaiwanChina.mobi; TaiwanChina.us, AsiaCritical.com, AsiaEssential.com,
MissionCriticalAsia.com, etc.
III.
PaiPinChen.com
Nyseasiaworld worldwide.
Nyseasia.com
Nyseasia us; nyseasia NY
IV.
Mission
Critical, Broad, NY, USA since 1979.
V.
Mission
Critical & Essential, Broad, NY, USA, Asia & worldwide.
VI.
Mission
Essential & Critical ,Time, Life, Space, NY, USA & Worldwide
VII.
Face General,
Essential & Critical Worldwide.
VIII. Combat Climate Change Local & Worldwide.
IX.
Green Energy
& Power Promotion Task Force, local & Worldwide.
X.
Usahsr.com;
usaamericanservice.com
Please
note: The materials shown below Not for any purposes and also Not for
Construction.
Please
contact me or the head office in NYC, New York, USA should you have any
suggestions or planning for your coming projects. –Thanks. Philip Pai-Pin Chen.
Draft.
Revised
and updated required.
CONTRACT
CHECKLIST
This
checklist was reviewed on September 23, 2014
, at N/A , between Mr. /Ms. N/A of “NYSEASIA & Associated” and Mr. /Ms. N/A Of “Specific
Lands owners “ , and will be used as
the basis of the Agreement between both parties.
When
agreed to by both parties, this contract checklist can be attached as a rider
to the Agreement; and therefore, be a part of the Agreement.
1.
Project Description
1.1 Type of Project
1.2
New and/or Existing Building(s)
1.3
Type of Construction (i.e., steel
and concrete, concrete, etc.)
1.4
Number of Buildings
1.5
Base Building Core and Shell
and/or Tenant Work
1.6
Gross Square Feet Areas of
Building(s) and Site (Acres)
Day one, contract checklist, nyseasiaworld,
09222014.
P1 of 13 (continued).
1.7
Location (address if available)
City, State, Country
1.8
Estimated cost if established
1.9
Method of preparing documents and
bidding (i.e., Fast track, multiple prime contract, etc.)
Work Additional Comments
2. Scope
of Services Included Engineering
Services
a. Schematic Design Phase*
(1) Studies-Engineer will study
the following alternative
systems including advantages,
disadvantages, budget cost
and recommendations.
-HVAC
(INCLUDING CENTRAL PLANTS) (LIST)
-ELECTRICAL
(List)
-SANTARY
(List)
-VERTICAL
TRANSPORTATION (List)
-FIRE AND
LIFE SAFETY (List)
-SECURITY
(List)
-COMMUNICATIONS
(i.e.,data, etc.) (List)
-Other
Notes:
(a)
Recommendations for further
studies
in subsequent studies
in subsequent
phases of project.
(2)
Survey of existing facilities and
conditions and report of findings.
(3)
verification of accuracy of
drawings or other information furnished by owner.
(4)
Design Criteria including
applicable codes and standards, and systems descriptions.
(5)
Space conditions and weights for
M/E and other applicable trades equipment.
(6)
Outline Specifications.
(7)
System Flow and/or Riser Diagrams,
block layouts of M/E and major spaces.
Day two, contract checklist, nyseasiaworld,
09222014.
P2 of 13 (continued).
(8)
Part or full typical floor layout
for:
-HVAC
-ELECTRICAL
-SANITARY
-FIRE PROTECTION
(9)
Major equipment sizing.
(10)
Discussions
and confirmation
with applicable public agencies
and utility companies concerning
project and services.
Note: This should be specifically
discussed with client
since on some
projects (especially
in the Schematic
Design Phase ) we are
directed not
to contact anyone
regarding the
project.
(11)
Preparations
of estimated
construction costs on a square foot
basis.
(Note:
This may be provided by Engineer,
Construction Manager, General Contractor
or Cost Consultant. )
b.
Design Development Phase (Based on
Approved Schematic Design Phase) *
(1)
Additional Studies for:
-HVAC (List)
-Electrical (List)
-Sanitary (List)
-Vertical
Transportation (List)
-Automation (List)
-Fire and Life Safety
(List)
-Security (List)
-Communications (List)
-Other (List)
Day three,
contract checklist, nyseasiaworld, 09242014.
P3 of 13 (continued).
Filed. ieeemobippcpe@gmail.com;
nyseasia@gmail.com;paipinchen.com,09242014.
No comments:
Post a Comment